2 214 m3 of cast reinforced concrete was used and 1256 tons of metal units were assembled. | Construction was realized without traffic closing. | Bridge span, girder, with orthotropic plate.
Railroad bridge length 264 meters. Construction metal arch span with arch’s length of 135 meters. Highway bridge length is 340 meters, 8 lanes. Arch span 135 meters. Pole basement is pile supported, and made of drilled piers 1,5 m in diameter and up to 32 m deep. | Railroad bridge length 264 meters. Construction metal arch span with arch’s length of 135 meters. Highway bridge length is 340 meters, 8 lanes. Arch span 135 meters. Pole basement is pile supported, and made of drilled piers 1,5 m in diameter and up to 32 m deep.
Krasnoluzhskyi bridge relocation 2 km up the Moskva river was realized at 9,5 days period. Length of span is 135 meters. Floating system of 1400 tons consisted of 2 fl oating piers on barges of 1200 tons capacity, connected by plate girder, and one fl oating pier of 3000 tons capacity. | Andreevskiy bridge relocation.